Ready solutions: steel buildings and structures
+30–50% rental area without changing the land plot — new floors using LSGS technology, trading doesn't stop
All premises occupied, tenant queue exists — but nothing to lease. You lose profit every day.
A separate building means a plot, foundation, utilities from scratch. Long, expensive, risky.
Above your shopping center — untapped potential. Every month without an extra floor means hundreds of thousands of hryvnias in lost rent.
New retail halls, shops, showrooms — full-fledged spaces for lease
Office space above the retail zone — income diversification, higher rental rates
Warehouse premises for tenants — added value without a separate building
| Parameter | New building | Extension (LSGS) |
|---|---|---|
| Cost | from $800/m² | from $350/m² |
| Timeline | 12–24 months | 2–6 months |
| Land plot | Required | Not required |
| Business interruption | Yes | No |
| New utilities | From scratch | Connection to existing |
| Payback | 3–5 years | 12–18 months |
* The calculation is approximate. We'll provide an exact quote after inspecting your property.
Light steel gauge structures weigh 3–5 times less than brick or reinforced concrete. This allows adding floors to existing buildings without reinforcing the foundation and load-bearing walls.
No foundation reinforcement needed — 30–40% budget savings
From 2 months — start leasing space sooner
Structures manufactured at the plant — only assembly on site
Installation in any weather — no seasonal delays
Non-combustible materials, compliant with building codes
Service life 50+ years
Real project — adding floors without business interruption
Built a second floor on an operating store in 3 months. Trading never stopped for a single day. Tenants moved in a week after completion. Recovered costs within a year.
Hesitated between a new building and an extension for a long time. Chose REDICON — and never regretted it. Saved 40% of the budget, gained an additional 1,200 m² of quality space.
Professional team — from building inspection to commissioning. Handled all permitting documentation. Recommended for serious projects.
Task discussion, preliminary assessment of extension feasibility
Structural audit, determining allowable load
Working project, cost estimate, permits
LSGS structure production at our own factory
Phased construction without stopping shopping center operations
Put into operation, documentation handover, warranty
LSGS structures are 3–5 times lighter than traditional ones. Before design, we inspect the load-bearing structures and calculate the allowable load.
No. Installation is done from above — in stages, without affecting shopping center operations.
From 2 months — depending on the area. Structures are manufactured in parallel with site preparation.
In most cases — no. That's exactly why LSGS is used — minimal load on existing structures.
We do — full cycle: project, expertise, permits, commissioning.
From 5 years on structures and installation. LSGS service life — 50+ years.
Above your shopping center — unused square meters. Find out how many floors can be added — quote within 24 hours
Get a quote