Your Own Warehouse in 45–90 Days — No Overpayments or 80% Prepayment

Payback in 18–24 months. Full cycle: design, manufacturing, installation. Turnkey warehouse and hangar construction with LGSF across Ukraine

Quote within 24 hours
Fixed estimate in the contract
5-year structural warranty
16+ years of experience · 600+ projects · Own manufacturing & design bureau
Updated: READYCON Engineering
Key Facts

Are you currently renting a warehouse?

In 2 years, you'll pay the landlord over 2,400,000 UAH

You could invest that money in your own asset that works for you

Trusted by: Agricultural Holdings Logistics Companies Manufacturing Enterprises Construction Companies Farming Operations
16+years in business
600+completed projects
from 45days — warehouse construction
50+years — service life

Need a warehouse — but how to build it right?

Three main problems for businesses without their own warehouse — and how a prefab LGSF warehouse solves them

Equipment sits out in the open

Corrosion, breakdowns, loss of up to 30% of equipment value. Every season without shelter means direct financial losses

These are annual business losses

Warehouse rent — money down the drain

Paying for someone else's property, no control, rising prices every year. Your own warehouse pays for itself in 18–24 months

These are annual business losses

Traditional construction — slow and expensive

12+ months, huge budgets, red tape. An LGSF warehouse is built 3–5 times faster

These are annual business losses

Three warehouse types — for any purpose

Cold, insulated, or with a crane beam — choose the warehouse type for your needs

Cold storage warehouse built with LGSF by REDICON

Cold Storage / Hangar

Equipment, raw materials, goods storage. Uninsulated storage hangar — minimum cost prefab warehouse

from 4,000 UAH/m²estimated cost
4560 daysconstruction time
Insulated warehouse with sandwich panels by REDICON

Insulated Warehouse

Year-round operation, sandwich panels, heating, staff comfort. Turnkey warehouse facility for logistics and manufacturing

from 6,000 UAH/m²estimated cost
6090 daysconstruction time
Warehouse with overhead crane — industrial facility by REDICON

Warehouse with Crane Beam

Production shop, auto service, heavy equipment. A complete production solution — not just a building, but a business tool

from 8,000 UAH/m²estimated cost
75120 daysconstruction time

Key point: Three main warehouse types turnkey — cold (from 4,000 UAH/m², from 45 days), insulated (from 6,000 UAH/m², 60–90 days) and with crane beam (from 8,000 UAH/m², 75–120 days). All based on LGSF frame.

A warehouse is not an expense. It's an investment

Your own warehouse pays for itself in 1824 months — after that, you stop paying rent and have an asset on your balance sheet

Calculation Example

Warehouse area500 m²
Estimated LGSF costfrom 2,500,000 UAH
Equivalent rental cost~100,000 UAH/mo
Annual rental savings1,200,000 UAH
Payback: 18–24 months Then — full rental savings + your own asset

Traditional Construction vs LGSF

Comparison of traditional construction vs LGSF warehouse
Parameter Traditional LGSF Warehouse
Timeline 9–14 mo. 1.5–3 mo.
Cost per m² High 30–40% lower
Foundation Massive Lightweight
Expansion Difficult Easy, modular
Seasonality Summer only Year-round
Payment 80% prepayment Staged

After 2 years:

You stop paying rent
You have your own asset on the balance sheet
You can sell or lease it
Get a personalized payback calculation

* This calculation is approximate. We will provide an exact estimate after consultation

Key point: Your own LGSF warehouse pays back in 1824 months by eliminating rental payments. LGSF is 30–40% cheaper than conventional construction, builds 3–5 times faster, with staged payments.

Why LGSF is the best technology for warehouse construction

Light Gauge Steel Framing (LGSF) is the foundation of prefab warehouses and storage hangars. Structure is 3–5 times lighter than concrete. Clear span up to 24 m — open space for equipment and cargo without intermediate columns. The ideal technology for a turnkey warehouse.

Less foundation — less budget

Structure is 3–5 times lighter than concrete. Save 20–30% on foundation

Faster assembly — launch your business sooner

From 45 days to a finished warehouse. No wet processes

No columns — more usable space

Clear span up to 24 m. The entire area works for you

We build year-round

No waiting for summer — installation in any season

Safety and compliance

Non-combustible materials, Fire rating I–IV

Lasts 50+ years

Galvanized steel, minimal maintenance

LGSF structures for warehouse construction — READYCON

Key point: LGSF structures are 3–5 times lighter than concrete, provide clear spans up to 24 m, installation from 45 days without wet processes, year-round construction, 50+ year service life.

Our Completed Warehouse Projects

Want the same? We'll calculate your warehouse cost →

See How We Build

Grain Storage Hangar Construction

Arched grain warehouse 15×30 m — full construction cycle

More videos on our YouTube channel →

What Our Clients Say

Built a cold warehouse of 800 m² in 2 months — from design to handover. We've been operating for a year without any issues. Staged payments without 80% prepayment — that was crucial for us.

O.K.
Oleksiy Kovalenko
Director of Dnipro-Logistik LLC, Dnipro

We ordered a 1,200 m² hangar for storing agricultural machinery. Combines and tractors no longer stand in the rain. Built in 2.5 months, including foundation. Equipment is in perfect condition even after winter.

V.M.
Viktor Melnyk
Head of Agro-Melnyk Farm, Novomoskovsk district, Dnipropetrovsk region

We needed a warm warehouse of 600 m² with a 5-ton crane beam for a production facility. ReadyCon designed it for our specific loads and built it in 3 months. Frame and sandwich panel quality — top-notch.

I.L.
Iryna Lytvynenko
Director of ZaporizhStal-Service LLC, Zaporizhzhia

One company — from design to warehouse commissioning

Full cycle from a single contractor — 6 stages from the first call to commissioning

01

Consultation

We discuss the task, purpose, budget

02

Site Survey

Geodesy, soil, utilities

03

Design

Structural design, architecture, engineering networks

04

Manufacturing

Production at our own factory

05

Installation

Frame assembly, cladding, roofing, gates

06

Handover

Documentation, warranty, commissioning

Key point: 6 stages of turnkey warehouse construction — consultation, site survey, design (SM, SMD), production at own factory, frame and cladding installation, facility handover with documentation and warranty.

Estimated Cost of Your Warehouse

from 2,000,000 UAH
Estimated turnkey warehouse construction cost
Get an exact quote

Calculate Your Warehouse Cost

Leave a request — we'll prepare a custom quote within 24 hours

Preliminary estimate — within 1 business day
Engineer consultation — free
Staged payment — no 80% prepayment

We don't share your contacts with third parties. A manager will contact you within 30 minutes during business hours

Or call us directly: +38(067) 285-07-09

Who This Solution Is For

Prefab warehouses — a solution for logistics, agriculture, manufacturing, auto service, and real estate investment

Logistics Companies

Warehouses for storage and cargo handling

Agribusiness

Equipment hangars, grain storage, seasonal storage

Manufacturers

Workshops with crane beam, turnkey warehouse facilities

Auto Service & Repair

Repair bays, vehicle storage

Investors

Warehouse real estate as an income-generating asset

What Happens If You Delay Construction?

Rising Metal Prices

Metal prices rise 10–15% annually. In six months, the same warehouse will cost more

Rising Rental Rates

Every month of rent is 100,000+ UAH that never comes back. Per year — 1.2M UAH into someone else's pocket

Inflation Devalues Your Money

Money in the bank loses value. A warehouse asset — preserves and grows value

An LGSF warehouse is not just a metal hangar. It is an engineering system where every joint is calculated for specific loads: snow, wind, and live loads. We design according to four DBN standards, manufacture on CNC equipment with ±1 mm precision, and install without wet processes. 600+ facilities, 0 incidents in 16 years — this is not marketing, it is engineering statistics.

Denis Tykhonov, Chief Engineer at ReadyCon Engineering, 16+ years of experience in LGSF warehouse design and construction
DT
Denys Tykhonov Chief Engineer · REDICON Engineering Structural engineer with 16+ years of experience in LGSF design and construction. Author of technical solutions for 600+ projects across Ukraine — from warehouses and hangars to industrial complexes. Specialisation: turnkey prefabricated steel-frame buildings.

Frequently Asked Questions

How much does it cost to build an LGSF warehouse?

It depends on the area, type (cold/insulated), and engineering systems. Estimated cost starts from 4,000 UAH/m². Exact calculation — after consultation.

What are the timelines for turnkey warehouse construction?

From 45 days for a cold warehouse, 2–3 months for an insulated one. Design and manufacturing run in parallel.

Is a foundation needed for a prefab warehouse?

Yes, but a lightweight one. LGSF structures are 3–5 times lighter than concrete, so a pier or strip foundation is sufficient.

Can the warehouse be expanded in the future?

Yes. The modularity of LGSF allows easy addition of sections, increasing height or area without dismantling.

Who handles design and permitting documentation?

We handle the full cycle: design, approvals, construction, handover. We have our own design bureau.

What is the warranty on the warehouse?

Structural warranty — from 5 years. Service life — 50+ years with proper maintenance.

Ready to discuss your turnkey warehouse? Leave a request — we'll prepare a quote and timeline within 24 hours

Get a Quote & Timeline

Turnkey Warehouse Construction in Ukraine — Prefab Steel Warehouses (LGSF)

Turnkey warehouse construction is a comprehensive solution for businesses looking to move away from renting and acquire their own asset. READYCON designs and builds prefab warehouses from steel structures and LGSF across Ukraine: Dnipro, Kyiv, Zaporizhzhia, Kharkiv, Lviv, Odesa and other cities. We deliver warehouse complexes for logistics, manufacturing, agriculture and trading companies — from 300 to 5,000+ m². Full cycle of works: design, frame manufacturing at our own factory, installation, insulation, engineering networks and commissioning. Warehouse construction time — from 45 days. Staged payment without 80% prepayment.

What Warehouses We Build

Cold Storage Warehouses

Prefab warehouses for storing products, equipment and raw materials without heating. Steel frame or LGSF structure, profiled sheeting. Area: from 300 m². Cold warehouse construction time: 45–60 days. Minimum budget — ideal solution for seasonal storage of equipment, grain, building materials.

Insulated Warehouses

Sandwich panel warehouses for year-round use. Suitable for manufacturing, logistics, storage of goods with temperature requirements. Turnkey insulated warehouse includes heating, ventilation, lighting and gates. Construction time: 6090 days.

Warehouse Hangars

Large-area hangar structures without internal columns. Clear span up to 24 m — maximum usable area for cargo equipment. Storage hangar is ideal for logistics hubs, agricultural companies, auto services and manufacturing facilities.

Advantages of Steel Structure Warehouse Construction

LGSF Technology for Warehouses

LGSF (Light Gauge Steel Framing) is a modern warehouse construction technology that allows reducing timelines and budgets. An LGSF warehouse means factory precision manufacturing, fast assembly and minimal foundation costs. LGSF technology is used for warehouse construction across Ukraine: from small equipment hangars to large logistics complexes. Design is carried out in accordance with DBN V.2.6-198:2014 "Steel structures".

Warehouse Classification A, B, C, D

In Ukraine, warehouse facilities are classified into four quality categories:

Warehouse Classification A / B / C / D
Parameter Class A Class B Class C Class D
Ceiling height10+ m6+ m4+ many
Flooringanti-dust, load 5+ t/m²concreteconcrete / asphaltany
Heatingyesyespossibleno
Docks / rampsyes, adjustableyespossibleno
Fire resistanceREI 45+REI 30+REI 15

REDICON designs and builds Class A, B and C warehouses. Design compliant with DBN V.2.2-7:2022 "Warehouse Buildings and Structures", DBN V.1.1-7:2016 "Fire Safety of Construction Objects" and DBN V.2.6-198:2014 "Steel Structures".

Load Calculations for Warehouse Buildings

When designing a warehouse, the key factor is calculating the frame's load-bearing capacity per DBN V.1.2-2:2006 "Loads and Effects":

How Much Does Warehouse Construction Cost?

The turnkey warehouse construction price depends on the area, structure type (cold or insulated), height, crane beam availability and engineering systems. Estimated warehouse construction cost in 2025–2026:

from 4,000 UAH/m² Cold Storage
from 6,000 UAH/m² Insulated Warehouse

We prepare an exact warehouse construction estimate within 24 hours after consultation. The price is fixed in the contract.

Get a warehouse cost estimate

Stages of Turnkey Warehouse Construction

  1. Site analysis — geodesy, geology, utilities and connections check
  2. Design — architectural solution, structural design, engineering networks, permitting documentation
  3. Steel structure manufacturing — frame production at READYCON's own factory in Dnipro
  4. Frame installation — load-bearing structure assembly on site
  5. Cladding and insulation — profiled sheeting, sandwich panels, roofing, gates
  6. Engineering systems — electrical, ventilation, heating, water supply as needed
  7. Commissioning — complete documentation, acceptance certificates, 5-year warranty

Why It's Profitable to Build Your Own Warehouse

Warehouse rent is a constant expense that increases every year. Warehouse rental cost in Ukraine is from 80,000 to 150,000 UAH/month (500 m²). Your own warehouse is an asset that:

Our Completed Warehouses & Hangars

Office-Warehouse Building Dnipro 850 m² · 2.5 months
Aircraft Hangar Kyiv Oblast 1,200 m² · 3 months
Livestock Complex Novomoskovsk district 2,000 m² · 4 months

Total 600+ projects completed across Ukraine over 16+ years. View all projects →

Common Questions About Warehouse Construction

How long does it take to build a turnkey warehouse?

From 45 to 90 days depending on the area, structure type and engineering system complexity. A cold warehouse is built faster — from 45 days. An insulated warehouse with engineering — 60–90 days. Design and manufacturing run in parallel, reducing the overall timeline.

Is a building permit required for a warehouse?

Yes, most projects require permitting documentation. We handle the full cycle: design, approvals, obtaining permits. READYCON's own design bureau takes care of all the paperwork.

Can a warehouse be built in winter?

Yes. LGSF and steel structure technology allows installation in any season. The absence of wet processes is the main advantage. We build warehouses year-round across Ukraine.

What foundation is needed for a warehouse?

Usually strip or pier — determined after geological survey of the site. LGSF structures are 3–5 times lighter than concrete, so the foundation is significantly cheaper than for traditional construction.

How much does it cost to build a 1,000 m² warehouse?

Estimated cost of a 1,000 m² turnkey warehouse: cold storage — from 4,000,000 UAH, insulated — from 6,000,000 UAH. The exact price depends on height, roof type, gates, engineering systems. Estimate within 24 hours after consultation.

In which cities do you build warehouses?

We build warehouses across Ukraine. Key regions: Dnipro, Kyiv, Zaporizhzhia, Kharkiv, Lviv, Odesa, Poltava, Vinnytsia, Kropyvnytskyi and others. Steel structure manufacturing — at our own factory in Dnipro, installation — by mobile crews.

What is the warranty on the warehouse?

Structural warranty — from 5 years. Steel structure warehouse service life — 50+ years with proper maintenance. Galvanized steel provides corrosion protection.

Can the warehouse be expanded in the future?

Yes. The modularity of LGSF and steel structures allows easy addition of sections, increasing height or area without dismantling the existing part. This is one of the key advantages of the technology.

Related Articles

Call Us Message

Wait!

Get a free consultation on warehouse construction. Leave your number — we'll call back in 15 minutes.

Free consultation, no obligations